top of page

ENERGY EFFICIENCY IN LOCAL ADMINISTRATION

Decarbonization actions by local public administration, with a particular focus on buildings, leading by example in the adoption of innovative and ambitious policies, reducing energy intensity and increasing energy efficiency, promoting a building stock with high energy performance and low carbon.

GEOGRAPHIC AREA
NUTS II CENTER

FINANCING RATE
85%

SPECIFIC CONDITIONS
Present a total calculated cost exceeding 200,000 euros.

ELIGIBLE EXPENSES
Local Public Administration Entities
a) Carrying out studies, plans, projects and other preparatory and advisory activities directly linked to the operation, including the preparation of cost-benefit analysis, when applicable;
b) Civil construction work and other engineering work;
d) Acquisition of equipment, monitoring systems, information, technology, material and software;
e) Inspection, security coordination and technical assistance;
g) Price revisions resulting from applicable legislation and the contract that affect the eligible value of the work actually performed;
h) Information, dissemination, awareness-raising and publicity actions that prove necessary to achieve the objectives of the operation.

Call

+351 912 492 529

Email 

Follow us!

  • Facebook
  • LinkedIn
  • Instagram

Contacts

AVEIRO

Via do Conhecimento, Edifício Central,

Escritório 1.71

3830-044 Ílhavo​

t. +351 211 372 063 // +351 917 214 588

projetos@gmconsultores.pt

imagem__1_-removebg-preview.png

LISBOA

Rua Castilho, 39 - 12ºF Ed. Castil

1250-068 Lisboa

t. +351 215 807 581 // +351 912 492 529

Miraflores

Rua General Ferreira Martins n 10 6B

1495-137 Algés

  • Facebook
  • Instagram
  • LinkedIn

COIMBRA

Rua Padre Estevão Cabral 79, 2º piso sala 206

3000-316 Coimbra

t. +351 239 198 090

Privacy Policy

site criado por Innovstrategy Lda

bottom of page